
Digging a well with a hand pump and ceramic pipes to a depth of 25-30 meters – Pakistan
310 D.B.

مواصفات المشروع
✅ The well is dug to serve between 3 and 5 houses.
✅ The well water is used for drinking and daily use by the villagers.
✅ The well structure is built with concrete and ceramic tiles.
✅ Project panel type: Fiber
✅ The well is dug manually using plastic pipes and a high-quality hand pump.
✅ The approximate lifespan of the well is 5 years or more, God willing.
✅ The well is dug to a depth of 15-20 meters.
✅ One-year warranty on the pump to repair any malfunctions or defects
✅ We can arrange a visit to the project site upon your request
✅ You can request an inspection visit to your project for a nominal fee
✅ All stages of implementation are documented from scratch with photos and videos and the actual project site is attached
✅ We make sure to invest your project in the location that needs it most to get the most benefit
✅ After requesting the project, you will receive an invoice and a notarized contract from the company that includes all the details of your project
✅ Abiar Al-Sagaya Company is committed to the strictest confidentiality of all data related to its customers

مشاريع ذات صلة
140 D.B. السعر الأصلي هو: 140 .د.ب.120 D.B.السعر الحالي هو: 120 .د.ب.